Radhi Small Hydro Power Project

Installed Capacity:
4.4 MW

Tallo Khare Khola Hydro Power Project

Installed Capacity:
11 MW

Syange Hydro Power Project

Installed Capacity:
183KW

News & Events

Annual Report of CHDC for FY 2076-77

December 27, 2020

Annual Report of CHDC for FY 2076-77; download file:

Back ยป 

© CEDB Hydropower Development Company Limited. All Rights Reserved.
Site by: